86-592-7165701
中文版  |  English
Notice:
This requires JavaScript and the Flash Player. Get Flash here.
Friend Links
 
  F.A.Q Home > F.A.Q  
 
(1) Which is the lead time after my order ?
For diesel injection parts if ready in stock usually are needed 3-5 days after receive the payment.
For turbo system parts if ready in the stock usually are needed 2-3 days after receive the payment.
IF the goods out of the stock,we will arrange producing it,just please keep patience to wait for 7-9days or more to wait it.
 
 
(2) How can I pay the parts ordered?
It’s possible to pay in the following ways:
Advanced Telegraphic Transference
Western Union.
The payment methods and bank details we can indicate it in the proforma invoice.
 
 
(3) How about the shipping ways and the cost ?
We have our professsional agent for dealing with the shipment so we suggest:
More than 45KGS,can be deliveried by air way
Less than 45KGS,can be deliveried by express way such as DHL/TNT/UPS/FEDEX
More than 500KGS or more weight,can be deliveried by sea transportation.The shipping cost depends on: parcel,
weight and dimensions and from your country distance from China and the cost will be indicated in our offer.
 
 
         
 
  E-mail:sales@kd-diesel.com       Skype: kd-diesel@outlook.com
China KangDa Diesel Parts Co., Ltd. is a manufacturer specialist in diesel engine parts. Major products:Diesel Nozzle, Diesel Plunger,Delivery Valve, Lucas Head Rotor,Control Valve,Control Valve 9308-621C,9308Z621C,9308-621C Black,9308-622B Black,Pencil Nozzle,Valve Injectors, Nozzle Holder,Common Rail Injector,Common Rail Nozzles,Common Rail Valve,Delphi Control Valve,Control Valve for BOSCH Injector,Common Rail Injector Valves,BOSCH Common Rail Valve,Russian Nozzle,Russian Plunger,diesel element, Diesel Engine Parts,Marine Nozzle,Marine Plunger,Marine delivery valve,marine engine parts,Cam Disk,Magnet Valve,Common Rail Control Valve
Copyright by Kang Da Diesel Parts Co., Ltd. All Right Reserved Designs:cnann.net